We drilled under large freezer buildings to level the building back from frost heave. It’s a very tedious process, but the end result is a roof that settles back down and doesn’t need to be replaced. It takes a lot of time, but after the system is up and running, it slowly takes the frost out of the ground and levels the concrete back to the original level. We go nation-wide to help building owners fix their frost problems.